How can we better align our maintenance operations and capital planning efforts? That’s a question many facilities leaders can’t answer. So, let’s discuss how FMX’s Capital Planner can help you make smarter, data-driven decisions about day-to-day maintenance and future capital projects.

In this webinar, we’ll focus on questions like:

  • What does a lack of capital planning actually cost us?
  • Are our current PM plans saving us money?
  • When should we repair or replace critical assets?
  • How do utility costs factor into capital planning?
  • How can we get more buy-in from our technicians?

Join us for this live conversation and ask your own questions to our expert team!

Access the full recording

"*" indicates required fields

This field is hidden when viewing the form

Presenters

Joshua Moore

Joshua Moore

Manager, Product Management at FMX

View profile

Justin Dyson

Justin Dyson

Manager, Professional Services at FMX

View profile

Transcript

Josh Moore: Alright, everybody. We’re going to kick this thing off. I’m sure more folks will be trickling in as we go, but I’m excited to get rolling. Welcome, everybody, to the webinar Better Together: Bridging the Gap Between Maintenance and Capital Planning. Our hope for today is that you can walk away with some new strategies to improve your capital planning, and also learn how to empower your teams.

We’re going to do a Q&A format throughout this conversation, and I want you to be able to ask your burning questions. So throughout the conversation, if you see the little Q&A button at the bottom of Zoom, I’d love for you to throw some questions in there. We’ve got Jenny joining us. She’ll be answering questions directly in the chat. And any questions that are good for this conversation, I’ll surface here, and Justin and I can talk through them together.

With that, let me introduce myself. My name is Joshua Moore. I’m one of the product managers here at FMX. I’m really glad to have Justin Dyson joining me. He’s spent over 23 years in K-12 facilities, from technician to actually leading and overseeing maintenance programs and facilities planning.

Justin, I know you spent time in both a small rural district and a large urban one. 50,000 students, right? More than that?

Justin Dyson: Yes. About right.

Josh Moore: Yes, sir. And now he gets to help other facility leaders grow in their careers. So it’s really an honor to have Justin joining us.

As I mentioned, the format is going to be very conversational. Nobody wants to be part of a webinar that’s just stiff. We want the conversation to be free-flowing, which is why we’d love to have those questions in the chat. If you’ve got stuff you want us to cover or talk about, definitely put it in there.

Some of the big questions we’re definitely going to cover today: what the lack of capital planning actually costs us, how we can evaluate our PM plans to make sure they’re actually saving us money, how to make the critical decision of repair versus replace, and how to get more buy-in from our team. I mentioned that one of the goals of the webinar is to help us empower our teams.

That’s a big part of it. How can we get our technicians engaged in the process?

To kick things off, we’d love to throw a poll out there.

You’ll see it come through in just a moment. There we go. On a scale of one to five, how well aligned would you say your day-to-day maintenance operations and your long-term capital planning efforts are?

If you want to put some answers in.

And, yes, Dave, this will be recorded. I see that question in the Q&A already. Thank you. We will be recording this and sending it out after the fact.

Very good. We’ll leave that poll open a little longer and come back to it in just a second.

Cassie, once we get a decent number of respondents, we can go ahead and close that poll so we can see the results. But thanks, everybody, for submitting. And with that, let’s jump into our first conversation piece. This is a question for you, Justin. I’d love to hear, in your experience: What does a lack of capital planning actually cost us? I’m sure you’ve got some stories about times when not having a robust plan in place cost the organization.

Justin Dyson: Yeah, we sure did.

Like you talked about, over 23 years, I’ve worked with everything from not having a system at all to having a really robust system like FMX. And during that time, you experience all different angles of this.

So today, a lot of what I want to do is ask some thought-provoking questions. We may not walk away from here today with the exact answer we need, but I hope some of the conversation we have here makes you think about things in a little different light, and start considering some of the conversations you can have with your team to redirect the plan we’ve always done. Because sometimes we get stuck in that mode. When it comes to what it actually costs us, it’s more than just the replacement of that asset, or the downtime.

It’s more than that. One of the things that comes to mind for me is systems where we’ve deferred asset replacement for years, or maybe the maintenance upkeep is not quite what it’s supposed to be.

How many of you have ever had to run that BMS, run the air conditioning systems 24/7, just so they would maintain, because they wouldn’t recover in the morning when it got a little too cold, or the temperature just didn’t recover? So we ended up running those 24/7. Not only were we adding hours to that equipment, making it age a little quicker, but we were also burning those utilities.

And for most of you, if your operational budgets were like mine, the utilities were paid out of the same operational budget our maintenance and upkeep funds were coming from, so one impacted the other. It just becomes this vicious cycle.

But we can even go further. Maybe a chiller goes down in a building, one we’ve deferred for a little while, or maybe haven’t maintained for a period of time. What does that cost us in the long run when it just fails, and we can’t get it going again? Now we’re displacing students. For me in K-12, the students were my primary stakeholders.

If I’m displacing the students, that is a huge cost to our district, to our performance, to kids’ learning, and all that good stuff. So that’s the first step. But then maybe we’re having to bring in a portable unit. Well, that’s an additional cost to try to keep that building cool.

And then we’re going through this emergency action of replacing that unit. That’s obviously going to cost us more. But one of the big things that stands out to me is that I was always reporting to a board of education. When we had this emergency come up, what did we do? We ran to our board, maybe even called a special meeting just to review it.

Then we got up there unprepared. We didn’t have all the data we needed, and we stood in front of our board, and they said, why are we here now?

Why were we not addressing these issues before?

Well, you might stand in front of them and say, because we didn’t have the funds. We didn’t have the capital funds to replace it. But then they may come back to you and say, but you never asked for this before. You never laid out a plan for us.

That’s such a huge issue. One of the big costs there is that we lose credibility with our board, or with whoever holds the purse strings for us.

If we’re losing that credibility, what does the next meeting look like? What does the next meeting look like? Some of these things are preventable.

A lot of these things are preventable. Take the chiller example. Sometimes something just fails.

It just fails, out of the blue. It’s not because of our lack of maintenance or our lack of planning. But in my experience, a lot of times, it is because of our lack of planning. And that’s where we start talking about our PM program.

How are we evaluating those PMs and building them out in a strategic way?

Josh Moore: Yeah. Absolutely. I’m sure people in the chat can relate to that feeling of getting blindsided, or perhaps having to work with a smaller budget than you expected, and maybe not having the ammunition to make the ask appropriately. I’d love to hear from you in the chat if anyone’s had a similar experience to what you just described, Justin. I’m sure it’s a common sentiment.

And, also, a reminder: If you have any questions throughout, definitely don’t hesitate to put them in the Q&A. But let’s switch gears. Justin, you just mentioned PMs not saving us money. I’m curious about the tie-in here. How do you see PMs potentially not saving us money, and what’s the connection to capital planning?

Justin Dyson: It’s one of the number one pieces of capital planning. When I think about capital planning, I’m thinking about this newer type, or newer mindset, about how we do it.

For years, we would have a few of our assets down, and then it was just generalities about our facility condition. You had this big notebook, and you worked to decide… your board would ask you, hey,

we need to do a bond.

What are we going to put in there? And you’d scramble to get these things together.

But if we’re truly doing asset management, PMs are the number one component of it.

How can we be good stewards of our funding if we’re not keeping up those big capital assets?

Josh Moore: Yeah.

Justin Dyson: And, again, I’m a storyteller. So I think back to when I was a technician.

I was probably 21 or 22. I actually told this story just last week at a conference, but I was 21 or 22 years old, and I was riding with the HVAC technicians. I had been to school to be an HVAC tech, and I was riding with them. And every winter, for about two years in a row, I realized we continued to get these calls for our rooftop heat pumps.

It would be the dead of winter. It’s cold, and they were tripped out on high head pressure. And probably 90% of you on this call know exactly where I’m going now.

We would go up there, and the filter was sucked against the coil. It was in heat mode, so it tripped out the unit.

And then you’d just be working along, and we’d come to a little slow period, and the boss would look at you and say, let’s go change some filters today. And I’d look at the boss and say, where at? I’ll just pick a place.

So we didn’t really have one of the most basic PM programs in place back then. He gave me permission, and I built out this PM program, and I noticed we got fewer calls.

And you know that equipment was performing better as far as energy goes, and it was lasting longer, because the head pressure wasn’t running so high, all those things. But in those days, I didn’t have any way to prove it. I wish I could go back now with the systems we have and actually prove it.

I did a similar thing with child nutrition equipment. I won’t tell the whole story, but I remember there was a little circulating fan motor on top of a warming cabinet. It was a Winston warming cabinet, and that motor was $318. This was 25 years ago.

I replaced those often. They were stopped up with dust, which was supposed to be keeping the motor cool.

So in our PM program, we just started blowing those out. A really simple task. And I remember that the very next year, after we first did that PM program, I didn’t get a single call on that particular motor.

So, again, I wish I’d had the systems I have now. Fast forward a little bit to leading the facilities of a large district. I remember looking at my trade supervisors… we were just chatting about some stuff in a supervisor meeting, and I said, we really need to evaluate our PM programs. A lot of these PMs were put in place maybe five or six years ago, and I think it’s good practice to review the efficacy of these.

So we had this back and forth, and I kind of felt like I got a deer-in-the-headlights look, because I don’t think they had ever been asked to do that.

And what it made me realize was that half of the PMs we had cycling were probably not being performed as directed.

They were probably being pencil-whipped. And we as the supervisor group maybe didn’t even know about some of the PMs, because they were just mundane. We adapt to what we’re given, and the technicians probably didn’t see value in them.

And back then, we weren’t equipped with the mindset, or maybe the technology, for how we were supposed to evaluate them. What metrics can we even use to make an educated decision around that? So it really opened my eyes to where we sat. Pull up that next slide there.

One of the things we can use when we’re looking at whether PM programs are effective is our maintenance cost. And this is where I want to introduce a single-system approach to doing our maintenance: our planned maintenance, our reactive maintenance, and our capital planning, or, as an alternative term, asset management, because that’s the root of overall capital planning. Capital planning doesn’t just involve requesting a bond or something like that. Capital planning involves creating our PM programs.

That’s how we maintain a capital asset. On this chart here, don’t pay attention to it being an AHU or anything. It’s just an example. But if we introduce a PM program, say, in 2023, as we’re seeing rising costs over time…

And then from 2024 through 2025, we saw a declining cost in our reactive maintenance. That’s a positive thing. The PM program must be working.

But, on the other hand, if we look at the orange line down there, maybe a different type of equipment, we’re not seeing that same response. It’s kind of flatlined there.

So what do we do with that data? That’s where capital planning comes in: our reactive maintenance, our planned maintenance, and the cost of all of those as they relate to the asset.

Now we can make an informed decision. Now we can review that PM program. Some PM programs are very frequent. They can’t all be evaluated over the same time period.

I can’t think of an example right off the top of my head, but for some, you may need to have that PM program in place for maybe two years before you can truly see if there’s an impact. Some, maybe two or three months.

But using that data on how much the asset is costing us over time, through trends and things of that nature, is one way we can take a look at whether our PM programs are actually effective.

Josh Moore: Yeah. I love that approach of bringing in more data and visualizing the trend line of how those costs are changing over time, and comparing that to how much urgency and priority you’re putting on the PM program. I know it’s common practice.

You want to have a good PM program. But how do you see PMs changing throughout the lifespan of an asset, especially as it nears a perceived end of life?

Do you see those PM programs changing dynamically at all?

Justin Dyson: I think they definitely do. Through the life of a piece of equipment, there may be a lower amount of preventive maintenance on the front end of that asset, and maybe part of that is even done under the manufacturer’s warranty or something. Regardless, sometimes that equipment requires less maintenance on the front end.

And I know there is some equipment that’s very troublesome on the front end. If I say ERVs, a lot of you in the room are probably like, give me a break. They give us so much trouble. But I think, through the life cycle, we probably see a bell curve, where in the middle we need to be focusing on planned maintenance on that asset, to ensure we can get at least out to the replacement.

But then maybe we get the replacement cost approved. It’s budgeted. We know we’re going to get the funds to do that replacement, and maybe the replacement is a year or two down the road.

So we think about what type of planned maintenance tasks we’re doing. Is it something we could maybe skip for the last two years of that asset’s life cycle? Would it negatively impact the asset’s ability to continue operating normally? We obviously don’t want to impact downtime.

If it’s potentially going to impact downtime, we probably don’t want to skip it. But if certain pieces of that planned maintenance could roll off, we may save some money at the tail end of that asset’s life cycle. And we can use it on something else that’s maybe in the middle of its life cycle, or something we need to defer by two or three years because we didn’t get it approved, and ramp up the planned maintenance on that other asset so we can get another year out of it.

Josh Moore: I love that strategic moving of things around depending on their time of life.

In just a moment, we’re going to switch gears to that critical question of when we should repair versus when we should replace. Before I do that, though, I want to come back to this idea of getting your team involved. Justin, I know in our previous conversations, we had a lot of back and forth about how you empower the team through PMs, and, in just a moment, how you get them involved in capital planning and data collection. But on the topic of PMs, how do you get your team involved? Did you run into a situation like that, where you were trying to get your team empowered?

Justin Dyson: Yeah. I think there are a lot of examples around that.

I think there are always two responses to implementing change. One is that your team is very reluctant. They’re like, why do we have to do this? They’re just moaning about it. And the other response is: We know this is going to work, and we’re going to jump in headfirst. And that bridges us to one of the later questions in our presentation, when we talk about buy-in from technicians.

Let me put it like this.

Our technicians probably know that equipment better than any of us who end up managing the program. I used to work on the equipment, but once you’re out of the day-to-day operation, you’re not working on that stuff every day, and you kind of lose touch with it.

Those technicians know those systems.

So if we can empower them and make them feel comfortable enough to come to us with ideas about PM programs, or how we get this asset to last longer, or why we’re replacing this particular asset instead of that one… If we can show them, hey, the data we’re using here is actually going into place and making those decisions more… what’s the word for it?

It’s not just anecdotal decision-making. We actually have the data to back it up. That is so powerful.

Josh Moore: I love that. I love that. We’ve got a couple of questions here. Some of them I’m going to save toward the end, or Jenny may take them in the chat. But I want to call out one that just came through:

Does it make sense to have the technicians actually develop the PM program? How much would you hand over the keys to that, versus being collaborative?

Justin Dyson: I think it absolutely does. That’s exactly the story I was telling you earlier, from my early twenties: You develop a PM program, or a kitchen PM program like I did then. I’m sure some of you in the room have done similar things. I was a technician then.

And it completely makes sense. I knew the equipment. I knew the calls I was getting every day, and I developed that checklist. Then, to make it collaborative, depending on the size of your operation, maybe you’re an HVAC tech and you have six other HVAC techs. I think it’s reasonable to bring the others to the table to evaluate it.

Because you can make better decisions a lot of times with a group of people. But then, as facilities leaders, whether in facilities planning or facilities management, whichever side of the house we’re on, I think we also have to review it and know it’s coming. That’s really important, if we back up to what we were talking about earlier: How do we evaluate it if we don’t really know what’s happening? I think there’s always been this great chasm, which I’m going to talk about in a little bit, between the facilities management team and the facilities planning team.

Even if we’re the same person, we still have maintenance technicians here, and then we’re wearing two hats, facilities management and facilities planning. It depends on what day and what time it is, or which side we’re on. But facilities planning should be involved in planned maintenance. If they’re not involved in planned maintenance, they’re not truly planning

around asset management. They’re missing a piece of it.

Josh Moore: That’s so good. I also really appreciate that we’re getting some experiences shared in the chat around this topic, which I really love. If anyone else has experiences on this topic, I’d love to hear from you, and I’m sure others on the webinar would love to hear from you, too.

So keep that coming. Let’s switch gears here to the critical question: When is it time to repair versus replace? I know from our previous conversations that a lot of this centers around what you mentioned about data collection.

Certainly, the team plays a big role here. But I’m curious how you’d answer the question. If someone asked you, hey, when should we repair or replace? What are the defining variables that help me make that decision? What would you say?

Justin Dyson: Well, I think the way it’s always been done, and kind of the standard, is that we start with one important thing: manufacturer end of life, or RSMeans, or whatever tells me, hey, this rooftop unit should be replaced at 25 years.

That definitely is, and still is, our starting point. We have to have somewhere to baseline. But I think there are a whole lot of other factors we sometimes leave out. And I’ll just say that if you’re always using manufacturer end of life or industry standards, I guarantee you’re falling behind.

Because for me in K-12, we never had enough capital money to do all the replacements on an asset replacement cycle. It’s just never happened.

Josh Moore: Yeah.

Justin Dyson: So what other factors are we using to make informed decisions? There are things like I mentioned earlier. If we’re using a single-system approach, we can have things like a ratio. One of the ratios we use in our system is maintenance cost over replacement asset value, as a percentage.

That normalizes things, because if we’re talking about a $100,000 piece of equipment compared to a $10,000 piece of equipment, we have to make it a percentage. But when we’re evaluating something like maintenance cost over replacement asset value, there’s even another level we can use that data for: not only to prioritize our asset replacements, but to look at the way we’re operating a building. I know that in every district I ever worked in, we had what we called sister schools.

They were built in the same year, or within a year or two of each other. They had the exact same floor plan, the same systems, and all that good stuff. But what we would find is that some cost us more to operate, maybe on the energy side, maybe on the maintenance side. Do we have the data to prove that? If we can lay those two things side by side, we might even be able to make an operational decision, working with a building administrator: Your building is consistently costing more than this one, and we’re trying to figure out why. And we can start making decisions around how we operate things.

And if we’re having high maintenance costs, we’re probably shortening the life of those assets as well.

So even an operational decision about the way a principal is operating a building may be affecting our capital plan. Being able to use stuff like that, I think, is really cool for data-driven decisions. And then, obviously, there are some of the key factors we have listed here.

We’re seeing trends of increasing maintenance cost. Maybe we have a major repair. I used the chiller example earlier. Maybe this is a rooftop unit that cost, I don’t know, $70,000, and a repair pops up that’s going to cost $40,000.

Are we going to spend the $40,000, or are we going to make a different decision? I think that weighs into it, too.

Josh Moore: Yeah.

Justin Dyson: I can’t say what that line is for you. That’s a decision you have to make internally: what line you won’t cross. And I think it depends on your funding models and all that good stuff. One of the other factors we started talking about and using a little bit, which was kind of in its infancy a few years back, was a term called criticality.

What is criticality? We kind of coined the term within our organization, and a lot of people looked at us like we were crazy. What does that mean?

I look at criticality as defining the impact of something failing. To make that make good sense, I like to provide an example. We’ll use a school, since that’s my background.

Say we have an elementary school with 900 students in it.

And we have an elevator in it. Within that school, there are three students with limited mobility, and that elevator fails and is going to be down for three weeks.

What is the impact? Back to one of my earlier statements about our stakeholders: Our number one stakeholder was students. So it’s a big deal that it impacts students at all, but it impacted three out of 900 students. And what could we do with those three students on the third floor?

Maybe we could move those three students to the first floor for three weeks. So the criticality score for that elevator would be lower than something like a chiller that goes out for three weeks in the middle of August. That impacts all 900 students.

Josh Moore: Yeah.

Justin Dyson: Maybe it displaces them, if it’s 100 degrees outside. Maybe they end up canceling school. So that criticality is super high compared to the elevator. It’s just another factor to consider when you’re trying to make decisions. Again, if we’re just using manufacturer end of life, we’re going to fall behind. We have to have some other things to help us make decisions: things like maintenance costs, things like criticality, and things like a condition score.

One of the things we use in our platform is a condition score, typically critical, poor, fair, good, and excellent.

For each of your organizations, I think you have to define how you’re going to normalize the scoring, because it’s not always going to be one person doing the scoring, and even that one person may change over time.

So here’s an example we threw together of how you can normalize it.

Josh Moore: Yeah.

Justin Dyson: But when you’re thinking about condition scores, I’d encourage you to write it down. Have a process. Have some kind of standard base you can use to do the scoring.

This is another example of something that really needs to come into play and be a huge part of how we’re making data-driven decisions.

Josh Moore: Yeah. Oh, gosh, I love that: turning something that could be really subjective into something definable and objective, so you know you’re holding to these standards.

Justin, if you were to create a definition list like this for your organization, where would you share it out, or how would you get it into the hands of the folks going out and doing the actual condition evaluations?

Justin Dyson: If it’s our technician teams, we’re sitting down and doing a training session, with this in their hands, and then we’re pulling up that piece of equipment in our system.

Maybe we have a picture of the system on the wall, or on a slideshow, and we go through some examples. We’re going to sit in a room and do in-person training: Let’s evaluate equipment. Because otherwise, if we just hand this piece of paper to a group of technicians and say, I need you to go do an asset inventory on this building, and here’s your condition scoring matrix…

You’re going to get very different answers. I think it’s really important to sit down with that team before you send them out.

Make sure we are, in fact, normalized, because there will be questions.

Josh Moore: Yeah. I love that. Love that. The other one you mentioned, criticality, is huge. It’s really important to have definitions around criticality.

In your opinion, or in your experience, did you make this a toggle, yes or no, critical or noncritical? Or did you have a sliding scale of criticality?

If you were to go into FMX or another asset management system and track criticality, how would you recommend doing it?

Justin Dyson: I think it’s similar to the way we talked about using the condition score.

It’s a scale. It’s not on or off. It’s a one to five.

One being the most critical, maybe, and five being the least critical.

Josh Moore: Yeah.

Justin Dyson: And, again, I can’t sit here and tell you how your district should do that.

You have to write it down and figure out what is most important to us, our boards, and the rest of our stakeholders.

Each individual building may be a little different. You may have a building where there’s no way to move those limited-mobility students to a different floor, because all the floors are accessed by stairs, other than the elevator. That changes where that elevator falls on a criticality score. So those decisions have to be made independently, but it definitely needs to be a scale.

Josh Moore: I love that. I just feel like you’re giving yourself talking points for those conversations where you have to make the case for a capital plan. It’s like, hey,

here are our standard definitions for condition. Here are our standards for criticality. This isn’t just our gut instinct. We have something to back it up.

Could you see going into a board meeting or a conversation, bringing that up, reminding people, here are our standard definitions, and using that in the conversation?

Justin Dyson: I’ve absolutely been there. I had to do that. Because a board of education will question you if you give them any opportunity to.

Josh Moore: Wow. Yeah.

Justin Dyson: Especially when it comes to decisions about asset replacements, or spending money at a certain school versus another school. The last district I worked in was a large urban district, but it had a county section and a city section. There was always some concern about how we were dispersing our finances across the district. So if we can’t back that up with written processes, there will always be an opening for you to be challenged on the decisions you’re making.

That’s why it’s so important not to just have something like end of life. What happens when you have a decision between two different schools?

In my situation, maybe one was a city school where they didn’t feel like we were spending enough money. What if I moved that one and did the county school instead? How am I backing up my decision? Well, I’m backing up my decision because I’m seeing increased maintenance cost. The criticality score is higher for this building. Maybe the condition scores are lower, or the maintenance cost over replacement asset value is higher. What are the other metrics we’re using to make those data-driven decisions?

Josh Moore: Love, love, love that. Also, Jason, I really appreciate your version of a definition, too: Do you have a backup? Is this your one and only way to accomplish this task or support this operational function? That’s a great measure, too. If anyone else has other things they use at those decision points beyond condition or criticality, we’d love to hear from you. But, Justin, I’d love to switch gears… well, I suppose let’s start with this consideration for the group.

Do your maintenance technicians feel like they have input into these capital planning decisions? Do they get to have a say in how those decisions are made? Justin, I’m curious if you have thoughts here, maybe some experiences around making sure your technicians felt like they had a voice in this decision.

Justin Dyson: You’re using my phrase. That’s my phrase, Josh.

Josh Moore: I’m so sorry. Yeah.

Justin Dyson: No, I’m just messing with you. So, yeah, I like to ask, how do we give maintenance technicians a voice? I was a technician.

I was that person who didn’t feel like they could help impact the decision. Because, again, if we’re just replacing an asset on our asset replacement cycle… Everyone in this room has probably bought a vehicle at some point that turned out to be a lemon. And then you’ve bought another vehicle at some point that turned out to be phenomenal. Maybe some of you have put 250,000 miles on that vehicle, and it’s still running strong. So just using the manufacturer’s suggested replacement date gets us to a place where maintenance technicians are probably screaming at us: Why are you not replacing this piece of junk I have to work on twice a week?

In my case, my wife was a teacher, and she was saying, why are y’all not replacing this stuff? It breaks every day.

I was hearing it at home, too. It’s so common. I said it earlier: There’s this great chasm between capital planning and facilities management. There always has been, and we’re trying to break that barrier down.

I think one of the ways we break it down is through asset management. But here’s the other piece.

I saw somebody pop into the chat about how they rely heavily on technicians and facilities managers being deeply involved in the capital planning process. Five or six years ago, we would get ready to review our capital plans.

We’d do this annual review of our capital plan, and I’m going to talk about that a little more. We would bring in our trade supervisors and maybe a couple of technicians. They would come into the room, and we’d say, we need to review this plan. And they would just kind of spout out the stuff that needed to be done.

But there was never any data behind it. It was just: Here, go do this.

And I remember, as a technician, begging the boss to replace a piece of equipment. Maybe it happened, maybe it didn’t.

It’s just not a good method.

And I even think about PMs. Are we doing PMs just because of compliance? Like, we’re trying to get more PMs done.

Maybe we want to get our PM completion percentage up.

That’s all great, if they’re actually valuable. That goes back to the earlier conversation.

Josh Moore: Right.

Justin Dyson: So when can our technicians realize the value of entering that data into the maintenance work order when they complete it, tagging that piece of equipment, and being able to go back and see the logs on that piece of equipment when they go to work on it after someone else?

They’re able to click right in there and see what the last person did.

That’s a value-add to them. And what about being able to access data, right there, like wiring diagrams and warranty information, at their fingertips?

And then they realize, when they sit down with the capital team, that all the time they’ve been tagging this asset pays off. They bring it up to the capital planning team, and the team says, yeah, we already have that one on the list, because we see the maintenance cost over replacement asset value is at 70%.

And the technician’s going to go, hello! Finally, I have a voice. I think that’s a huge piece of it: when they start seeing that information paying dividends back to them and making their jobs better.

Making it effective. But, most importantly, when that technician feels valued for their opinion, which has now become data. Because at one point, it was only an opinion. Now it’s their opinion plus the data backing it up. They’re going to work harder for you. They’re going to be more productive for you.

They’re going to jump on board when you introduce a new plan. Empowerment is supremely valuable for a team that’s always been underpaid. In school districts, for example, they work with people with doctorate degrees and everything else, who often look down on maintenance technicians. I was that person. I know how that is. Anything we can do to empower them and make them feel valued…

Josh Moore: Wow.

Justin Dyson: And we’re getting a better decision.

Josh Moore: Yeah.

Justin Dyson: To me, that’s just so valuable. But I’ll also bring up one point I forgot about: one-time PMs.

Technicians can sometimes bring us ideas for something we can do one time that completely changes the reactive work that comes the next year. For example, in one of my districts, I had a supervisor who told me a story. I wasn’t there then, but they had these flush valves in one of their schools that were giving tons of issues in the toilets. They were constantly running, running, running, running.

Plumbers were going out there every other day, it seemed like, to replace one.

Remember I mentioned earlier that this conversation can go one of two ways?

You can have technicians who say, why do we have to do this? Or you can have technicians who jump on board because they’re empowered and feel like their opinions are valued. So they’re having a conversation about these things.

The supervisor listens and says, let’s go out there this year. You all have said that this flush valve is better than that one. Here’s the funding. We’re going to fund this from capital.

Here are all these flush valves. Go replace every one of them in this building. And there wasn’t a single ticket the next year. The technicians were on board because the supervisor listened.

Josh Moore: Wow.

Justin Dyson: And they saw that their opinion was valued. So even when we talk about asset management and planned maintenance, planned maintenance is not always recurring. Planned maintenance can occur one time, but it’s planned. They planned to do this over the summer. It was a planned maintenance occurrence that tied into asset management.

Josh Moore: Yeah.

Justin Dyson: We reduced our downtime. We reduced our maintenance cost over time. And the technicians were bought in, because the supervisor listened.

Josh Moore: Wow. That’s really, really good. We have a great comment here in the chat from Jason about surfacing cost to the technicians. I’m curious, Justin: How much would you advise letting the team know the cost difference between replacements and parts, basically opening the books, versus keeping it close to the chest? And how do you see that impacting the relationship?

Justin Dyson: So we’re talking about having transparency with the technicians? Is that what we’re reading?

Josh Moore: Yep.

Justin Dyson: I think transparency is part of empowerment.

If we’re hiding how we make decisions about asset replacements from our technicians, that’s going to devalue them. They’re going to think they’re not good enough to be part of that conversation.

There are obviously some things, personnel things, where decisions have to be made privately. But when it comes to how we’re managing our capital plan, how we’re managing assets, how we’re making decisions, and what tells me it crosses the line from repair to replacement…

I think being transparent is the best case. Now, I can also see the argument against it: Well, if they know that if I spend 2% more on this, we’ll get it replaced… I can see that argument.

Josh Moore: Yeah.

Justin Dyson: But I think it’s a bigger picture of being able to get there and be transparent. Because if the technicians know we’re listening across the district, they’re going to be less apt to make a bad decision like that, to fictitiously run the cost up by 2% so they can get it replaced, because they’re already bought into the program.

Josh Moore: Yeah. That makes a lot of sense. We’re getting a couple of other questions coming in, from both the chat and the Q&A section. Just a reminder: If you’ve got questions, we’d love to hear from you.

You can use that little Q&A button to send us your question. But this one from Laura is a good one, and I know it’s something you and I have talked about before, Justin: working in compliance-based PMs. Obviously, there’s not much wiggle room or flexibility on those compliance-based PMs. But how do you factor them into your PM schedules, especially in the end-of-life stage of assets?

Justin Dyson: Well, when we’re talking about compliance-based PMs, we’re talking about our boiler inspections, our fire sprinkler inspections, our emergency exit signs, our emergency exit door inspections, on and on down the list. Those are our priority-one planned maintenance. So anytime we’re implementing a planned maintenance program, that’s our priority one. They have to be done regardless.

It doesn’t matter. If we don’t do them, the fire marshal’s going to shut our doors. And we actually used the system to report that information to the fire marshal and to other…

Josh Moore: Yeah.

Justin Dyson: …compliance organizations. So, for example, for our emergency exit light planned maintenance occurrences, we would run a report of all 12 of those for each building, plus the one 90-minute test. And that was the report to the fire marshal.

Same thing with fire sprinkler stuff. We actually uploaded the third-party inspection documentation right to that planned maintenance occurrence. So regardless of whether it’s end of life or not, and how we’re dispersing the human resources we have, those have to be priority one.

Josh Moore: Yeah. And I like the language you used there. I imagine that’s probably similar to what you would tell the team as you’re getting buy-in for those types of PMs?

Justin Dyson: Yep.

Josh Moore: Yeah. Love that. With this, I want to jump to a question that was actually submitted by an attendee before the webinar. It was a phenomenal question, so we wanted to surface it here: “How can I set up and support management and teams to make maintenance and capital planning integration practical and sustainable?” Big question. I’m sure there’s a lot to unpack, but, Justin, I’m curious about your thoughts on this one.

Justin Dyson: My brain just starts firing off when I read that question. I think the crux of the issue is that capital planning is not reactionary, but we always make it reactionary. We’ve done that for years. It should actually be quite the opposite. It should be very proactive.

We react when equipment fails, and then we rush to our boards unprepared. Then we look unprofessional, and we get trapped on live TV, trying to answer a question we can’t answer.

Or we do our capital planning when the budget cycle rolls around.

Or maybe when the board asks us a question like, if we called up all of our deferred asset replacements in one year, how much would that cost? We get asked those crazy questions, and then we start capital planning. Or it’s a bond cycle, and then we start capital planning.

I believe, and I believe our organization as a whole is on board with this, that we need a single-system approach that’s not cumbersome.

That’s step one. If we can do that, it becomes part of the daily routine of our operation, and it’s not just us, maybe as a capital planning manager or a project manager or something like that.

Everyone within the facilities team is inputting information. We are capital planning by the minute, and we don’t even know it’s happening, because it’s a single-system approach.

So facilities management, facilities planning, maintenance technicians, property managers: Everybody is inputting data, and that gives us informed decisions on the back end.

And if we’re doing all that, capital planning just becomes an act of: Let’s run the report and see where we’re at. Instead of: I need to scramble for two weeks to compile all this data. I’ve got to get it all together because I have a deadline. Instead, it’s there. It’s alive. The assets are living.

Let’s run the report and see where we are. And fiscal decision-making becomes easier long-term, because proper planning can be done by those responsible. I think so often, when we get denied by our boards, or whoever holds our purse strings…

I think we very often blame them for our poor planning. That’s what happens. Somehow or another, we’ve got to turn the tide. We’ve got to change that narrative and say: I’m coming to this board prepared.

I know all the operational data backing this decision up. There’s not a question they can ask me around operations on this decision point that I can’t answer. The decision point for this board is a fiscal decision, not an operational decision. If we can keep the narrative there, our boards trust us.

We make better decisions because we know what the best decision is. Our board is often getting just that one piece of information, but they have to trust us.

And if they don’t trust us because we haven’t been giving them the proper information, maybe because we don’t have it,

then we lose credibility.

So somehow or another, let’s change that, turn the tide, and make it a better process.

Josh Moore: Love that.

Yeah. What a powerful thought to end on. I know we’re coming up on time. Justin, this was so hugely helpful: actionable steps to turn that tide and change that conversation.

I’d love to make a last call here. If anyone has anything we didn’t cover, or a follow-up to something we discussed, please put it in the Q&A. We’ll hold on for maybe the next five minutes for any last-minute questions.

Just as a call-out: We’d love to connect with you. In just a moment, I’ll put our contact info on the page if you want to reach out to us. We’ll send out the recording afterward, so you’ll be able to share it with your colleagues. And we do have a group of experts at FMX.

We’d love to talk to you, so definitely reach out. If you’d like a personalized demo of FMX’s capital planning tool, our work order management system, our PMs, our reporting… I know I saw some comments about reporting and utility management. For any of that, definitely reach out to us at gofmx.com/demo. And I’m going to leave this slide up as we close. This is our contact info.

Justin and I would love to hear from you if you want to reach out.

I’m going to monitor the Q&A and chat for just a moment.

For those of you who are dipping out, thank you so much for attending. I’ll be on for the next seven minutes or so for those who have questions.

Here’s a good one from Steve: “Just how far into the future should my deferred maintenance planning or liabilities extend? If my planning results in a new roof, do I have a deferred maintenance liability in 30 years to replace it again? A better example is a hot water heater with a short expected life. How many times is it a liability within a 20-year plan?” Justin, I’m curious if you have any thoughts on that one.

Justin Dyson: I’m contemplating that question a little bit.

In true asset management, obviously, if we have a piece of equipment that should be replaced… even things like a window system. You may not think about a window system, but it has a life cycle, too. It’s much longer than that water heater or that roof.

It may be 50 or 60 years down the road. But it is an asset that should be in our system, and it should be captured as an asset replacement that needs to be done, even 60 years down the road. If we can truly capture all of those asset replacements, then we can give our boards a picture of the total cost of operating this building for the next 50 years. Then you can make decisions about replacement, repair, or renovation of existing buildings.

Even with just your asset data, you can make a pretty good decision about that.

As far as it being a liability, I’m trying to understand the question, around liabilities, like a debt. We can do depreciation across it. I may not have fully understood the question. I may need it rephrased a little to make sure I’m fully answering it.

Josh Moore: Yeah, that’s so fair. Steve, if you’re still on, definitely reach out. We’d love to chat with you. Perhaps it’s something that would be worth a full conversation. That’d be great.